How to solve the maintenance problem of steel workshop building?
The wide application of steel workshop building plays a very important role in the development of the industry, but the later maintenance of steel structure workshop is a big problem. From the design of the plant, we should prepare for future maintenance. The steel structure design is generally designed according to the current geographical location, and the steel structure construction should also pay strict attention to safety issues.
After the steel structure building is completed, for the owner, we cannot change the original structure of the building at will. This includes adding partitions at will to protect and remove partitions, and no structural components can be removed. If you must relocate, you will need to contact the steel structure manufacturer. After professional calculation and judgment, it is up to the steel structure manufacturer to decide whether to change it.
The anti-corrosion performance of the steel workshop building is poor. After 5 years of factory use, the exposed outer structure should be painted and maintained, which not only prevents the parts from rusting, but also plays an aesthetic role. The colored steel tiles or sandwich panels on the roof require maintenance based on actual damage. Paint maintenance can be done for more than 5 years. If the material is more than 10 years old, it will be decided whether to replace it, partially or as a whole, according to the actual damage.
Then, it should be noted that the steel structure workshop should be cleaned regularly. Steel structure manufacturer recommend annual inspection and maintenance. If the exterior walls of the factory are painted steel, cleaning products that damage the paint, such as steel balls and steel brushes, are not allowed. The debris on the roof should also be removed together, and there should be no backlog.