How to install the steel warehouse gutters?
Preparation in advance
1. Determine location and size:
Determine the location and size of the drainage ditch based on the actual situation of the steel warehouse. This usually requires consideration of factors such as warehouse layout, drainage volume, and ground slope.
Use measuring tools such as tape measures, level gauges, etc. to accurately measure and ensure that the drainage ditch can meet the drainage needs.
2. Clean up the construction site:
Clean the installation area to ensure that the ground is flat and free of debris, providing convenience for subsequent construction work.
3. Prepare materials and tools:
Prepare the necessary materials and tools, including drainage ditch materials (such as stainless steel, resin concrete, etc.), cover plates, bolts, nuts, washers, concrete, cement mortar, etc.
Ensure that all materials comply with relevant standards and requirements, and that tools are intact and undamaged.
Excavation of foundation trench
1. Measure and mark:
Measure and mark the outline of the foundation trench on the ground based on the size and location of the drainage ditch.
2. Excavation of foundation trench:
Use excavators or manual excavation to ensure that the depth and width of the foundation trench meet the design requirements.
The bottom of the foundation trench should be flat and free of sharp objects to avoid affecting the stability of the drainage ditch.
3. Processing the bottom of the foundation trench:
Lay a layer of concrete cushion or crushed stone layer at the bottom of the foundation trench to improve the bearing capacity and stability of the drainage ditch.
Install drainage ditch
1. Place drainage ditch:
Place the prefabricated drainage ditch in the foundation trench to ensure accurate and stable positioning.
2. Fixed drainage ditch:
Fix the drainage ditch in the foundation trench using fixing components such as bolts, nuts, and washers. The quantity and specifications of fixed components should meet the design requirements.
3. Connect the water outlet:
Connect the water outlet as needed to ensure smooth drainage. The position and size of the water outlet should be determined according to the actual situation.
Laying the cover plate
1. Prepare cover plate:
Prepare suitable stainless steel cover plates or cover plates made of other materials according to the size and shape of the drainage ditch.
2. Laying cover plate:
Lay the cover plate above the drainage ditch, ensuring a tight fit and no gaps between the cover plate and the drainage ditch.
Use bolts or other fasteners to secure the cover plate to the drainage ditch to improve its stability.